365平台官方网站-365娱乐登录网址

Hotline:13775442299
PVC plastic template

Contact

Jiangsu Wangke New materials Co., Ltd. 

Contact: Manager Wang. 

Mobile phone: 13141505998. 

Contact: manager Li. 

Mobile phone: 13775442299. 

Tel: 0518 81183228. 

Fax: 0518 81183328. 

E-mail: jswkxcl@163.com. 

Web site: www.jswkxcl.com. 

Add: no. 5 Donghai road, Haizhou development zone, Lianyungang city, Jiangsu province



Material Analysis of Building template

Your current location: Home >> News >> Industry news

Material Analysis of Building template

Date of release:2019-07-10 Author: Click:

Jiangsu Wangke New Materials Co., Ltd. is a main building template company, so what kind of role does building template play in our daily life? 

What is its construction material? 

Building template is a kind of temporary supporting structure, which is made according to the design requirements, so that the concrete structure and components can be formed according to the prescribed position and geometric size, maintain their correct position, and bear the self-weight of the building template and the external load acting on it. 

The purpose of template engineering is to ensure the quality and construction safety of concrete engineering, speed up the construction progress and reduce the project cost.

JiangSu Wangke New Materials Co.,LTD


The building template structure used in the construction of cast-in-place concrete structure is mainly composed of three parts: panel, supporting structure and connector. 

The face slab is the bearing plate which directly contacts the newly poured concrete, and the supporting structure is the temporary structure of supporting panel, concrete and construction load, which ensures that the building template structure is firmly combined and does not deform and destroy. 

The connector is an accessory that connects the panel and the supporting structure as a whole. 

Building template is the mold shell and support formed by concrete pouring. According to the nature of the material, it can be divided into building template, building wood glue board, film-coated board, multi-layer board, double-sided compound glue, double-sided film-coated building template and so on. 

According to the construction conditions, the building template can be divided into cast-in-place concrete template, pre-assembled template, large template, jump template and so on. 

In this paper, the combined steel template is briefly introduced as follows: the combined steel template is a new type of template with the advantages of strong versatility, convenient assembly and disassembly and many turnover times in modern template technology. 

When it is used for the construction of cast-in-place reinforced concrete structure, the large template of beam, column, wall and floor can be assembled according to the design requirements in advance, and the whole hoisting method can be put in place, and the method of bulk disassembly can also be adopted.

JiangSu Wangke New Materials Co.,LTD

The building template used in the construction of modern pouring concrete structure is a kind of temporary model structure to ensure that the concrete structure is poured into concrete according to the design requirements. 

It has to bear the horizontal load (lateral pressure of concrete) and vertical load (dead weight of building template, material structure and construction load) in the construction of concrete structure. 

After seeing so much, I believe you also have a certain understanding of Jiangsu Wangke New Materials Co., Ltd., want to know more information, welcome to consult us.


The address of this article:/en/news/440.html

Key word:

Recently browse:

Related products:

Related news:

Crust foaming template

Scan the code and learn more

Contact

Jiangsu Wangke new materials Co.,Ltd

Tel:13141505998/13775442299

Email:jswkxcl@163.com

Web:www.jswkxcl.com

Add:No. 5 Donghai road, Haizhou development zone, Lianyungang city, Jiangsu province

365平台官方网站|365娱乐登录网址

XML 地图 | Sitemap 地图